Hot Tapping & Live Line Tie-Ins

Add a new branch to a running chilled or condenser water line without stopping it. Built for fit-outs, new equipment and contractors working in buildings that cannot lose cooling.

What is hot tapping?

Hot tapping makes a new connection into a pipe while it stays full and under pressure. A branch fitting and isolation valve are fixed to the running pipe and pressure-tested. A tapping machine then cuts through the pipe wall through the open valve, withdraws with the cut-out coupon, and the valve is closed. The new branch is ready to connect, and the system never stops.

Reviewed by the MSTECK engineering team · Updated

At a Glance

Run pipe sizes
3/4" (DN20) to 16" (DN400)
Systems
Chilled water, condenser water and other water lines
Fittings
Welded branch fittings or mechanical split tees, with an isolation valve
Before the cut
Fitting and valve pressure-tested on the live pipe
Coupon
The cut-out disc is retrieved and handed over
Before work
Site survey, method statement and risk assessment (RAMS)
Working hours
Day, night or weekend, to suit an occupied building
What Hot Tapping Lets You Do

New Connections on Live Chilled Water Lines

A drain-down to add one branch can cost a building a full day of cooling. A hot tap keeps every other floor running while the new connection is made.

  • Fit-out branches: chilled water connections for new tenant spaces on occupied floors.
  • New equipment: connections for added AHUs, FAHUs and FCUs during expansions.
  • Bypass lines: so plant can be serviced in future without a shutdown.
  • Instrument points: sensor pockets, pressure points and BTU meter tappings.
  • Drain and vent points: added to lines that were built without them.
  • Contractor tie-ins: live connections scoped and done for main contractors.

Why FM Teams Call MSTECK

  • Run pipes from 3/4" to 16" on chilled and condenser water
  • Fitting pressure-tested before any cut is made
  • We can also install and commission what the branch feeds
  • Free site survey, with RAMS issued before work starts
  • Night and weekend work in occupied buildings

Get a Hot Tapping Quote

An engineer reviews every request and replies with an approach and a quote.

Please enter your name.
Please enter your phone number.
Please enter your email address.
Please tell us briefly what you need.

By sending this form you agree to our Privacy Policy.

Prefer to message us directly?

Typical Jobs

When to Hot Tap Instead of Shutting Down

Fit-Outs in Occupied Buildings

Connect a new tenant space without cutting cooling to everyone else.

Plant Expansions

Add equipment to a running chilled water system during trading hours.

Main Contractor Tie-Ins

Live connections on occupied sites, done to the contractor's programme.

How We Work

How a Hot Tapping Job Runs

  1. Survey. We confirm pipe size, material, wall condition, pressure and temperature at the tap point.
  2. Plan. A method statement and risk assessment are shared with your FM team or consultant.
  3. Fit. A branch fitting and isolation valve are fixed to the live pipe.
  4. Test. The fitting and valve are pressure-tested before anything is cut.
  5. Tap. The tapping machine cuts through the pipe wall through the open valve and withdraws with the coupon.
  6. Close and connect. The valve is closed, the machine removed, and the new branch is ready to pipe up.

What You Receive

  • Method statement and risk assessment before work
  • Marked-up tap location and branch size
  • Pressure test record for the fitting
  • The retrieved coupon, as proof of a clean cut
Before You Appoint Anyone

What to Check in a Hot Tapping Contractor

  • Do they check the pipe wall? The tap point needs sound pipe. Ask how wall condition is checked.
  • Is the fitting tested before the cut? A pressure test on the fitting and valve should come first.
  • Is there a written method statement? It should cover the fitting, test, tap and what happens if a step fails.
  • What happens to the coupon? It should come out with the machine and be handed over.
  • Can they finish the job? A branch is only useful once it is piped, insulated and commissioned.
  • Do they work out of hours? Occupied buildings often need night or weekend access.
Questions

Frequently Asked Questions

Does hot tapping need a system shutdown?

No. The pipe stays full and under pressure throughout. Only the new branch is isolated, behind its own valve.

What pipe sizes can you hot tap?

Run pipes from 3/4" (DN20) up to 16" (DN400). The branch size is set by what the new connection needs and confirmed at survey.

Which systems can you hot tap?

Chilled water, condenser water and other water lines. We confirm pipe material, wall condition and pressure at the survey.

Is the fitting welded or clamped?

Either. Steel lines usually get a welded branch fitting. A mechanical split tee is used where welding is not suitable.

What happens to the piece of pipe that is cut out?

The tapping machine holds the coupon and brings it out through the valve. We hand it over as proof of a clean cut.

How long does a hot tap take?

Usually one shift for the fit, test and tap on a typical branch. Larger sizes and poor access take longer. The method statement gives the plan.

Should I use hot tapping or pipe freezing?

Hot tapping adds a new connection. Pipe freezing isolates a section so an existing valve or pipe can be replaced. If you need both, one team can do both.

Can you do the rest of the installation?

Yes. We can pipe, insulate, connect and commission the equipment the new branch feeds.

Which areas do you cover?

Projects across the UAE, including Dubai, Sharjah, Ajman and Abu Dhabi, run from our office in Al Qusais Industrial Area 5, Dubai.

Get a Quote for Your Project

Pipe size, system, location in the building and when it needs doing. Photos help. An engineer replies with an approach and a price.